Once the existing balconies at the building were exposed. STONE replaced all of the existing reinforcement bar at the balconies with new to ensure structural stability.
Prior to performing any steel repairs, STONE made sure the proper forms were created and installed following the curve of the exterior balconies to maintain existing form of the building.
Once all the necessary forms were set, the concrete pouring at the balcony curbs began. STONE made sure that the newly poured balconies color matched the existing perfectly.
STONE also made sure that the topside and underside of the balcony decks were repaired, patched, and coated to exhibit a brand new balcony, full restored, and ready to use with new balcony railings top mounted to the newly refinished curbs.