Prior to coating of the new limestone patch, STONE had to measure all existing limestone sections of hte building to assure accuracy of the new patch to match existing conditions perfectly.
STONE made sure to specifiy the replacement of all existing lintels found to be in decrepit. Brick replacement and new masonry pointing was also allocated at the facad where lintel replacement was necessary.
The decorative stone portions at the top end of the building also required attention; the watertable. STONE utilized the suspended scaffold to indicate what decorative stone sections required reapirs or patching. Upon the completion of repairs, the water table looked brand new.
Upon completion of decortaive stone patch repairs, STONE then specified the installation of a new, fresh looking clear coating on the existing decorative stone to protect the decorative stone for years to come.