STONE began with the rehabilitation of the existing gym space, replacing the existing rubber mat flooring, installation of new mirrored walls, and updating to the newest gym equipment.
In addition to the gym, STONE scoped the rehabilitation to the adjacent sauna interior; replacement of the existing sheetrock, new lighting installation, door replacements, HVAC replacement, and installation of new flooring to give the space a contrasting, vibrant look.
Upon performing the rehabilitation within the sauna space, STONE scoped the installation for new, modern door systems for heavy duty use.
The interior of the suana was also well cared after - with the replacement of existing finishes with new full size wall tile and installation of new chrome colored fixtures.
The existing bathrooms were also updated with full partition and finish replacement, new paint, flooring, sink, and toilet system.
STONE scoped for the installation of a new multi tonnage unit, updating the building to the newest regulations and creating all the openings and fittings for the use of the new system with the updated 13th & 14th floors of the building.
At the 14th Floor, STONE scoped and designed the replacement of the existing flooring with a new ceramic wood tile and metal backsplash tile finish to accent the space.
STONE scoped the replacement of all existing paritions and finishes to be replaced per owners direction.
STONE assisted the client with interior color finishes as well as the type of furniture to be included within both spaces of the 13th & 14th floors of the building.
STONE scoped the replacement of the existing storefront glass system for the 13th and 14th floors of the building with a new, low-E glass system to accent the exterior of the building. The exterior terrace was also cared for and power washed of any debris found.